Skip to content

Infrastructure at the Bockenberg raw materials recovery centre

Project period

2015 until 2016

Client

AVEA Entsorgungsbetriebe GmbH & Co. KG

Task and implementation

AVEA GmbH & Co KG has been operating a raw material recovery centre in Bockenberg since 1997. Bulky waste, commercial waste and construction site waste are sorted here. In the course of expansion measures, we were commissioned to plan the associated infrastructure.

In accordance with these plans, the traffic areas were first extended in an easterly and northerly direction. In addition, we restructured the drainage with the help of a separation system according to surface water, roof area water and wastewater. Among other things, a rainwater clarifier and a retention soil filter basin were built for this purpose.

Project data 

  • Road surface in asphalt construction
  • Soil excavation and soil improvement with lime
  • Delivery, liming and installation of the soil
  • Drainage channel made of PE, PVC and concrete
  • Sewer manholes
  • Sliding chutes
  • Pre-sludge trap, coalescence separator and sampling shaft
  • Separating structure, rainwater clarifier and retention soil filter
  • Filling and washing area

Services

  1.     Basic evaluation
  2.     Preliminary planning
  3.     Design planning
  4.     Approval planning
  5.     Implementation planning
  6.     Preparation of the awarding of contracts
  7.     Participation in the awarding of contracts
  8.     Site management
  9.     Local construction supervision
  10. Accompaniment of commissioning and acceptance

Similar projects

back to project overview